Budget Guide

Ultimately, it’s not as easy as a set dollar amount per square foot. Different than new construction, a remodeling project often involves the demolition of existing features, moving walls, relocating electrical, air conditioning and plumbing and trying to match existing finishes. Without tearing into walls, floors, and ceilings, we can’t be certain what is involved but we understand that is not an option before delivering an estimate. We can, however, rely on experts to help identify potential challenges ahead of time and help you plan for the unexpected.

All quotes are personalized to each clients' specific needs. We work hard to utilize our prior renovating experience to accurately develop a quote for your individual project.

Our budget guide is meant to provide a rough number so budget conversations can begin.

  • Kitchen Overhaul

    starting at $75,000

    Gut kitchen, remove walls, modify locations of new appliances, new cabinets with soft close hinges and sliders, solid surface countertops, backsplash, lighting and floors.

  • Kitchen Fix-Up

    starting at $35,000

    Keep basic layout, replace cabinets, countertops, new tile backsplash & floors and keep all appliances in same location.

  • Kitchen Do-Up

    starting at $25,000

    Keep basic layout, paint cabinets, new countertops, tile backsplash & floors and keep all appliances in same location.

  • Primary Bathroom Overhaul

    starting at $45,000

    Gut bathroom, possibly remove walls, relocate plumbing, new cabinets, countertops, shower, tub, floor and all fixtures.

  • Primary bathroom Fix-Up

    starting at $30,000

    Keep basic layout, replace all plumbing fixtures, prefab vanity, new countertops, shower and floors.

  • Primary Bathroom Do-Up

    starting at $20,000

    Keep same layout, replace plumbing fixtures, paint cabinets, new countertops, shower and floors.

  • Secondary Bathroom Overhaul

    Starting at $30,000

    Gut bathroom, possibly remove walls, relocate plumbing, new cabinets, countertops, shower, tub, floor and all fixtures.

  • Secondary Bathroom Fix-Up

    Starting at $20,000

    Keep basic layout, replace all plumbing fixtures, prefab vanity, new countertops, shower and floors.

  • Secondary Bathroom Do-Up

    Starting at $15,000

    Keep same layout, replace plumbing fixtures, paint cabinets, new countertops, shower and floors.